Planning Board continues Pelham Road duplex hearing, demands traffic study and sidewalk plan

BELCHERTOWN — April 28, 2026 — Belchertown Planning Board continues Pelham Road duplex hearing, demanding traffic study and pedestrian access plan before any approval. The board voted 4-0 Tuesday to continue a site plan review for 50 Federal Operating Company LLC's proposed five-building, 10-unit, 30-bedroom duplex development on Pelham Road to May 26, after a public hearing in which five abutters described the Federal Street intersection as already dangerous. Engineer Keith Terry of Sherman & Frydryk acknowledged no traffic counts have been taken on Pelham Road and that the applicant's trip-generation estimate of 11 morning and 8 evening peak-hour trips was derived from ITE formulas not included in the submission. Member Mike Hofler called for the underlying ITE data and designated visitor parking; Chair Daniel Beaudette insisted on a pedestrian path to nearby commercial areas. Resident Marion Panto of 74 Federal Street said she waited 10 minutes to leave her driveway at noon the day before the hearing; Brenden Normand of 70 Federal Street said traffic backs up "all the way to Tilton Automotive" during peak hours. The board issued a seven-item punch list including a formal traffic count with speeds, dumpster capacity documentation, snow-storage markings, and a planting barrier to address headlight impacts on neighbors, with a Tighe & Bond peer-review response also required before the hearing can advance.

Keep reading with a 14-day free trial

Subscribe to Hampshire County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Hampshire County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe